Due to essential maintenance and upgrades of both our main pool and teaching pools, there will be periods of disruption to our normal operation. We have therefore had to make changes to our current programme, which are reflected below.
Teaching Pool Closed
Closed from 6th January 2025 – 16th February 2025 (6 weeks)
During the 6-week period of closure of our teaching pool, all swimming lessons will be moved to our main pool. Drop off and collection points have been moved for the period of teaching pool closure and are available to see on the pool layout plans button at the bottom of this email. We are going to be increasing the main pool temperature during this period to accommodate both main pool and teaching pool bathers. All other teaching pool sessions will therefore be cancelled for this period.
Both Pools Open
Open from 17th February 2025 – 16th March 2025 (4 weeks)
All teaching pool lessons will be moved back into our teaching pool and will therefore go back to our normal operational programme. The drop off and collection points will revert. All other teaching pool sessions will resume at this point. The main pool will also revert to its normal operational programme and the temperature will be re-adjusted.
Main Pool Closed
Closed from 17th March 2025 – 23rd March 2025 (1 week)
This period of closure will result in all main pool sessions being cancelled. All swimming lessons excluding Stage 3 will be cancelled, your swimming lessons direct debits will be corrected for the “dates inserted” to reflect the week of closure. Stage 3 lessons will be moved into the teaching pool and can be seen in the below “lesson layout plans” the drop off and collection point for Stage 3 will remain the same.
Works Completed
Sunday 23rd March 2025
At this stage all planned works will be complete and we will revert to our normal operational programme effective from Monday 24th March 2024.
Click the below button to see the lesson layouts during these time periods.
We apologise for any inconvenience this may cause and appreciate your understanding.
We will keep you updated on the progress of these works and the reopening of the pools.